Commercial Motors Rebate
Rebates are based on whole system performance as modeled by an Energy Solutions Company appointed by Island Energy (Utility). Be sure to contact the Utility early in your project design to verify rebate eligibility.
MOTORS
High Efficiency Motors
- Replacement of an existing motor or adding a new motor.
- Motor must be three-phase induction type, open drip proof (ODP), totally enclosed fan cooled (TEFC) classification, or general purpose application.
- Rebates are for new, NEMA Premium Efficiency motors ranging in size between 5 and 200 hp with Nominal Full Load Efficiency that meets or exceeds the values listed below. Motors must be listed in the latest version of Motor Master Tables on the following website.
http://www.nema .org/gov/energy/efficiency/premium
- Motors must be rates at 1,800 RPM
- Useful life period for high efficiency motors is defined as 15 years.
Application Process
- Customer can contact Utility for a free energy audit and a feasibility study conducted by an Energy Solutions Company appointed by the Utility to identify energy saving potentials at customer’s existing facility.
- Customer must sign a Letter of Intent with an Energy Solutions Company appointed by the Utility to conduct a fee base investment grade audit to assess potential savings at the customer’s expense, subject to partial reimbursement.
- Customer who is interested in a particular program resulting in energy savings identified in the feasibility study and willing to invest to improve energy efficiency at their facilities must file an application for that particular project with the Utility.
- Utility must approve the application with a written notice of acceptance before customer purchases and installs any equipment for the project.
- Customer must provide proof of purchases and installation including but not limited to the following information:
- Retailer/Contractor name, address and phone number
- Itemized listing of each purchase including quantity, product description, manufacturer, model number, or other identifying information.
- Purchase price per product
- Date “Paid in Full” or Payment Turns
- Product Installation date
- Upon project completion day and after all required documentations are received, Utility will start monitoring and evaluation process.
- Rebates requires inspections and/or measurements of the performance of the measures, therefore, customer agrees to provide access to the project site to the Utility’s designated officer and/or its agent and data information required for the evaluation.
Rebate Calculation
- 30% of the cost of the investment grade audit conducted by an Energy Solutions Company appointed by the Utility will be reimbursed by the Utility after the application being approved.
- Rebate for each qualified individual motor is listed below.
- Total reimbursement amount do not exceed $15,000 per application.
High Efficiency Motors-Open Drip Proof (ODP)
Rebate ID | Horsepower | Rebate Amount /Motor |
ODP-5 | 5 HP | $30.00 |
ODP-7.5 | 7.5 HP | $40.00 |
ODP-10 | 10 HP | $50.00 |
ODP-15 | 15 HP | $60.00 |
ODP-20 | 20 HP | $70.00 |
OPD-25 | 25 HP | $90.00 |
OPD-30 | 30 HP | $110.00 |
OPD-40 | 40 HP | $120.00 |
OPD-50 | 50 HP | $160.00 |
OPD-60 | 60 HP | $180.00 |
OPD-75 | 75 HP | $200.00 |
OPD-100 | 100 HP | $260.00 |
OPD-125 | 125 HP | $290.00 |
OPD-150 | 150 HP | $320.00 |
OPD-200 | 200 HP | $450.00 |
High Efficient Motors- Totally Enclosed Fan Cooled (TEFC)
Rebate ID | Horsepower | Rebate Amount /Motor |
TEFC-5 | 5 HP | $30.00 |
TEFC-7.5 | 7.5 HP | $40.00 |
TEFC-10 | 10 HP | $50.00 |
TEFC-15 | 15 HP | $60.00 |
TEFC-20 | 20 HP | $70.00 |
TEFC-25 | 25 HP | $90.00 |
TEFC-30 | 30 HP | $110.00 |
TEFC-40 | 40 HP | $120.00 |
TEFC-50 | 50 HP | $160.00 |
TEFC-60 | 60 HP | $180.00 |
TEFC-75 | 75 HP | $200.00 |
TEFC-100 | 100 HP | $260.00 |
TEFC-125 | 125 HP | $290.00 |
TEFC-150 | 150 HP | $320.00 |
TEFC-200 | 200 HP | $450.00 |
PROCESS IMPROVEMENT MEASURES
Motor upgrades (>200 HP)The energy-efficiency measures listed below may contribute individually or interactively to improve the overall energy saving of the process system. Other permanent energy-efficiency measures may be considered by the Utility if energy saving is demonstrated.
- New variable-speed drives installation or replacement on industrial fans, industrial pumps and air compressor motors
- Industrial fan replacements
- Industrial pump replacements
- Trimming impellers on industrial fans and pumps
- Water flow controls resulting in electric savings
- Exhaust hood and fan projects
- Installation of pulse devices for injection molding machines
Application Process
- Customer can contact Utility for a free energy audit and a feasibility study conducted by an Energy Solutions Company appointed by the Utility to identify energy saving potentials at customer’s existing facility.
- Customer must sign a Letter of Intent with an Energy Solutions Company appointed by the Utility to conduct a fee base investment grade audit to assess potential savings at the customer’s expense, subject to partial reimbursement.
- Customer who is interested in a particular program resulting in energy savings identified in the feasibility study and willing to invest to improve energy efficiency at their facilities must file an application for that particular project with the Utility.
- Customer must read the terms and agreements on the back of the application form and sign the application form.
- Utility must approve the application with a written notice of acceptance before customer purchases and installs any equipment for the project.
- Customer must provide proof of purchases and supporting documents within 90 days of purchase date and must include all of the following information:
- Retailer/Contractor name, address and phone number
- Itemized listing of each purchase including quantity, product description, manufacturer, model number, or other identifying information.
- Purchase price per product
- Date “Paid in Full” or Payment Turns
- Product Installation date
- Upon project completion day and after all required documentations are received, Utility will start monitoring and evaluation process.
- Rebates requires inspections and/or measurements of the performance of the measures, therefore, customer agrees to provide access to the project site to the Utility’s designated officer and/or its agent and data information required for the evaluation.
Rebate Calculation
- 30% of the cost of the investment grade audit conducted by an Energy Solutions Company appointed by the Utility will be reimbursed by the Utility after the application being approved.
- Electric custom rebate is $0.05/kWh saving in the first year demonstrated by the Investment grade audit report, subject to validations by the Utility.
- Total reimbursement amount do not exceed $15,000 per application.
Still Have Questions???
For more information, please call 707-562-5000.
Application
- Click to APPLY ONLINE NOW!
- Click to download, print, and mail your application to our offices